Tips for Selecting Paint Colors


AG Designs

AG Designs

There's nothing more satisfying than a freshly painted room. Am I right? Okay, maybe there are other things in life worth celebrating. But we can all agree that new wall color is the number one interior change that has a major impact on how the space feels. 
So, where do you begin? With infinite choices, here are some tips to narrow it down to the winner.

1. What Feeling Are You After?


AG Designs

2. Prioritize your budget

Cabinetry plays a starring role in the kitchen. Door styles, leg details and finishes will drive the cost up or down. 
Your flooring selection will determine the labor costs to install it.
Countertops are available in various slab sizes and price ranges. Your contractor will calculate which sizes are the best use of the material, avoiding excess waste which can translate into cost savings. Have a look at this break down from Cliq Studios for budgeting your kitchen remodel.


3. Assess your storage needs

Consider where you'd like to store pots and pans and baking sheets. Do you have multiple sets of dishware and flatware? Would you like any open storage or should everything be behind solid doors? Will some of the doors have glass fronts for display? Where will you put your spices? Plan for the locations of regular trash and recycling. Check out Rev-A-Shelf for storage solutions and inspiration.


AG Designs

4. Don’t forget about lighting

You’ll likely want different levels of light at different times and this requires planning from the beginning. The more control you assign to your lighting, such as dimmers and switches, the better. Natural light and all lighting should factor in to your selection of materials and paint. Here's a terrific guide from YLighting: How to Light a Kitchen


5. Have a contingency plan

Contractors don’t have x-ray vision and only until the walls are open will they truly know what they’re working with. Be prepared to review any findings to adjust your budget accordingly. Celebrate if all is in great shape from the get-go! 


6. Treat the crew well and respect their knowledge and skill

Your general contractor is responsible to communicate with his or her crew. If you have questions or changes, consult with your designer and contractor for guidance. A successful project depends upon effective and respectful communication between all.


7. Avoid big changes late in the game

Sometimes a material or product becomes unavailable and you have no choice but to re-select. But the time to consider A,B, or C options are early on when the design is still in the planning stages. There are significant costs (and time) involved to make changes once fabrications are in motion.
Ask your contractor for a timeline. It can shift depending on any unforeseen issues, but the work proceeds in an orderly fashion and they should be able to give you a good sense of what will be accomplished each week or month. This not only helps you plan around the remodel, it also holds everyone accountable.


AG Designs

Well before any dust or noise begins, planning a kitchen remodel can take weeks or months to develop, including drawings, material selections, purchasing of those materials and plumbing fixtures. Actual disruption to your kitchen and the road to a beautiful new space can take about 5-6 weeks. Cabinetry lead times are typically anywhere from 2-6 weeks and are installed after the flooring and electrical work is complete. Once the cabinets are in place and counters, backsplash and appliances are installed, your new kitchen will be ready to greet you!


Planning a partial or full remodel and need some guidance? Contact AG Designs to schedule a planning session to get you on your way.